VDOT- OFFICE OF COMMUNICATIONS
Details for VDOT- OFFICE OF COMMUNICATIONS
Craig Botetourt Scenic Trail Botetourt and Craig Counties Design Public Hearing https://www.virginiadot.org/cbst Tuesday, July 15, 2025 4 鈥 6 p.m. Eagle Rock Elementary School 145 Eagles Nest Drive Eagle Rock, VA 24085 Wednesday, July 16, 2025 4 鈥 6 p.m. Craig County High School 25239 Craigs Creek Road New Castle, VA 24127 Find out about a project to construct a 20-mile recreational scenic trail along the former Chesapeake and Ohio Craig Valley Branch railbed between the end of state maintenance on Route 818 (Craig Valley Drive) near Eagle Rock in Botetourt County and Craig County High School near New Castle in Craig County. The multiuse trail for walking, running, biking and horseback riding will mostly consist of a gravel surface that is anticipated to be approximately 10 feet wide with two-foot shoulders. It will follow the former railbed and some low-volume secondary roads and consist of 鈥渟hare the road/trail鈥 sections which will permit the use of motorized vehicles as well as sections of non-motorized use. Three new trailheads will be constructed, and six existing bridges along the former railbed will be modified to accommodate trail use. In addition, two existing box culverts will be rehabilitated, and two existing box culverts will be replaced. Review the project information and National Environmental Policy Act document in the form of a Categorical Exclusion at the public hearing or after at VDOT鈥檚 Salem District Office located at 731 Harrison Avenue in Salem, (540) 387-5353, (800) 3677623, TTY/TDD 711. Please call ahead to ensure the availability of appropriate personnel to answer your questions. The hearing will be held in an 鈥渙pen-house鈥 format and VDOT representatives will be present to answer questions. Property impact information, relocation assistance policies and tentative construction schedules are available for your review at the above address and will be available at the public hearing. The same information will be presented on both dates. In compliance with the National Historic Preservation Act, Section 106 and 36 CFR Part 800, information concerning the potential effects of the proposed project on properties listed in or eligible for listing in the National Register of Historic Places is provided in the environmental documentation. The comment period for this public hearing is between June 15 and July 26, 2025. Give your written or oral comments at the hearing or submit them by July 26, 2025, to Kelly Dunn, Project Manager, 731 Harrison Avenue, Salem, VA 24153. Comments can also be emailed to CBST@vdot.virginia.gov. Please reference 鈥淐raig Botetourt Scenic Trail Comment鈥 in the subject heading. VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information in regards to your civil rights on this project or need special assistance for persons with disabilities or limited English proficiency, contact Kelly Dunn at the phone numbers listed above. State Project: TOCB-011-858, P101 Federal Project: STP-011-2(036) UPC 122492 In case of inclement weather or other issues, the hearing in Eagle Rock will be held July 22 and the hearing in New Castle will be held July 23 at the same times and locations.
1401 EAST BROAD STREET ROOM 302, RICHMOND, VA 23219